Announcements

BoBL would like to invite Expression of Interest (EoI) from eligible bidders for the following two (2) separate work packages;

 

  1. Incorporated national companies namely Class ‘L’ Construction firms (hereinafter called contractor) registered with CDB for the execution of the Interior finishing works consisting of General Interior Works, Hard flooring & Wall finishes and Modular Grid Ceiling, Installation of façade glazing glass, Installation of UPVC window shutters only for corporate office building at Norzin Lam, Thimphu. Click here to download the tender document

 

  1. Registered bidders National, International or Joint Venture firms for the work ; Supply ,Installation, Testing & Commissioning (SITC) of Smart Building Infrastructure Solutions consisting of MEP Infrastructure, IP CCTV System, Access Control System, Public Address System, Fire Alarm System, Bank Token System, Fire Fighting System, LAN Network Infrastructure, HVAC, Boom Barrier, Audio Video Conferencing System, Meeting Rooms Management System, Tier III Data Centre Management System, Cue Management System & Integration Building Management System for the Corporate Office Building Construction. Click here to download the tender document

 

To solicit prospective Company/Firms’ feedback, on Technical specifications/Terms & Condition of the EOI, a pre-EOI meeting with all the prospective Company/Firms is scheduled on 21/11/17 at 10.30 AM. The bidders are also encouraged to conduct a site visit on this date. The venue of the meeting is specified in the document.

 

The details of scope of the work are as provided in the Terms of Reference (ToR).The Expression of Interest should include documents like Legal status, Technical Ability, Financial Capacity, Past Experience, and Works in Hand detail of the firm etc. On the basis of the information obtained through this EoI, BoBL will shortlist contractors who will be further invited to submit the detailed technical and financial bid.

 

This is only an invitation for EOI and the BoBL reserves the right to accept or reject any/all of the submission of the bidder’s EoI and the submission of EoI does not obligate BoBL to shortlist any/all of the bidders.

 

Information including terms of reference will be available on www.bob.bt from 14/11/2017 to 29/11/2017. The last time and date for the submission of the above EoI’s is 1:00 PM on 29/11/2017. And all future corrigendum/amendments etc related to these EoI’s, if any, will be also notified only on the BANK OF BHUTAN LIMITED website www.bob.bt and no separate advertisement will be released for the same. Prospective Company/Firms are therefore advised to regularly visit the BANK OF BHUTAN LIMITED website for any such updates until the final dates of submission.

 

For any clarifications and issues related to these EoI’s, you may contact:

Mr. Peter Han, Project Manager, TCO Project ,BoBL, City Office, NWAB Building, Thimphu, Bhutan at [email protected] any time during office hours till 25/11/2017.